You bought a house with panels on the roof, or an installer did the job years ago and the paperwork is in a drawer somewhere. Now someone asks: "Is it grid-tied or hybrid?" and you're not sure.
It matters. The type of system decides two things you care about: what stays on when the power goes off, and what paperwork your municipality expects. Here's how to tell, in plain terms.
The three types in one line each
• Grid-tied: panels feed your home and work alongside the grid. No battery. When the grid goes down, the inverter switches itself off.
• Hybrid: panels, a battery and the grid, all through one inverter. When the grid goes down, it keeps your backed-up circuits running from the battery and the sun.
• Off-grid: no connection to the municipal or Eskom grid at all. Panels and batteries carry the whole house, every day.
Why a grid-tied system goes dark in load-shedding
This surprises a lot of people: "I have solar, the sun is shining, why is my house dark?"
A grid-tied inverter is built to switch off the moment the grid disappears. This is called anti-islanding. If it kept pushing power into the street wiring during an outage, it could put people working on the lines in danger. So the inverter's own protection opens and it stops, even at midday. It also can't run on its own, because it needs the grid's signal to follow.
That's why a plain grid-tied system lowers your bill but is not a load-shedding solution.
How a hybrid keeps the lights on
A hybrid inverter does both jobs. With the grid up, it works with the grid, runs your home from the panels and charges the battery. When the grid drops, it disconnects from the grid (the same anti-islanding rule applies) and then forms its own small grid for the circuits wired to its backup output. The switchover is usually a fraction of a second, so most lights and routers don't notice.
The catch: only the circuits moved to the backup side stay on. Installers usually move "essential" circuits (lights, plugs, Wi-Fi, the fridge) to a backup distribution board and leave heavy loads such as the stove or the hot water source on the normal board. How many circuits were moved is a big part of what the installation cost. (How big that battery should be is a sum you can do yourself: How big a battery does my house need?)
And off-grid?
A true off-grid system has no grid connection to fall back on. The panels and batteries must cover everything, including cloudy weeks. If your house has a municipal or Eskom meter and the inverter is wired into your distribution board, you almost certainly don't have an off-grid system in this sense, even if the box says "off-grid" on the side. In Cape Town, for example, the City's own SSEG FAQ (March 2024 revision, checked November 2026) says off-grid and standby solar PV systems are no longer permitted on properties that have a City electricity connection.
Five checks to find out which one you have
You can do all of these without opening anything. Never open the inverter or the distribution board yourself — leave that to an electrician.
1. The load-shedding test. Next time the power goes off on a sunny day, look around. Everything dark? Most likely grid-tied. Some lights and plugs still on? Hybrid (or a battery backup system).
2. Look for a battery. A battery cabinet or wall battery cabled to the inverter points to hybrid or off-grid. No battery anywhere: grid-tied.
3. Read the label. Find the make and model on the inverter's sticker and look up the datasheet. The manufacturer will say "hybrid", "grid-tie" or "off-grid" in the first lines.
4. Look for a second board. A separate "backup", "essential" or "inverter" distribution board next to the main one is a strong sign of a hybrid.
5. Check the paperwork. Your Certificate of Compliance and any municipal registration documents name the system and the inverter.
Why the label isn't the whole story
What decides the rules is how the system is wired, not what the marketing calls it. An inverter sold as "off-grid" but wired into a house that is also on the grid is treated as a grid-connected system. Software settings such as "zero export" don't change that on their own. (A hybrid that still buys from the grid with a full battery is usually a settings question: Why is my battery full but I'm still buying from the grid?)
The paperwork part (check your municipality)
Rules differ by municipality, so check yours. Cape Town is a clear example: its SSEG FAQ (March 2024 revision) says all small-scale embedded generation systems in its supply area, including battery systems, must be registered and authorised, and that systems using inverters that are not on its approved list won't be authorised. A plug-in portable power station that isn't wired to your distribution board and has no fixed panels is treated as a different case there.
If you're not sure your system was ever registered, ask the installer for the Certificate of Compliance and the registration number, or ask your municipality's electricity department.
The short version
• Dark in load-shedding, no battery → grid-tied.
• Some circuits stay on, battery on the wall → hybrid.
• No grid meter at all, panels and batteries do everything → off-grid.
Your one action: next time the power goes off on a sunny day, walk round the house once and note what stays on. That one look answers most of this article.
Keep your solar papers in one place for the day you need them: SortBright Solar Insurance-Ready File (SortBright is our own product line).
Next up: how a hybrid decides where the power goes — panels, battery or grid first.
Circuit & Current explains home energy. This article is general information, not design or installation advice. Work on your inverter, battery or distribution board must be done by a qualified electrician, and grid-connected systems need the correct certificate and registration.
CIRCUIT & CURRENT
Home energy and electrical, from zero to engineer. Animated.
YouTube · Calculator · Newsletter · Privacy
Explainers only — not installation advice. Electrical, solar and battery work must be done by a registered or licensed person. © Kleinson Solutions